의료법인 유투의료재단 신축공사

  • Location

    열분해

  • Client

    의료법인 유투의료재단

  • 용도

    1종 근린생활시설1종

  • 규모

    지하3층~지상7층 / 7,917.81㎡

  • 공사기간

    2025.02 ~ 2026.12

Overview

With proven design and accumulated engineering expertise, we supply industrial boiler systems optimized for various industrial environments.

Our systems handle liquid, gas, and mixed fuels, meeting complex operating conditions in factories, plants, and thermal power stations. High-efficiency heat designs and advanced control systems ensure maximum energy efficiency, operational stability, and reliability.

Technology Introduction

  • Vung Ang2 Thermal Power Plant - Aux Boiler

    Natural Circulation Water Tube Boilers

    • Multi-fuel combustion (liquid/gas)

    • High-temperature, high-pressure large-capacity boilers

    • Thermal efficiency ~92%

    • Low water storage for faster steam generation

Project Portfolio

Swipe left or right to view the content.
Project Name Scope of Work Fuel Type Steam Condition Completion Year
SGC E&C – HSVC OL1 Steam Boiler (Hyosung Vietnam Plant) Boiler Supply, Installation & Commissioning Off-Gas, Natural Gas (NG), Propane Natural Circulation, Water Tube, 2-Drum Boiler 110 ton/hr, 46 barg, 380℃ 2021
Doosan Enerbility – Vung Ang II Thermal Power Plant (Vietnam) Aux. Boiler Supply & Commissioning Light Diesel Oil (LDO) Natural Circulation, Water Tube, 2-Drum Boiler 40 ton/hr, 16.5 barg, 300℃ 2024

Customer Inquiries